SIEMENS | REFILLING OF TRANSFORMER OIL & FILTERING OF 4160V AT MANILA HOTEL.
PULL OUT, TESTING & RE-INSTALLATION OF ONE (1) UNIT 250KVA 4160V AVR FOR SMC-PAMPANGA
|
WESTPOINT INDUSTRIAL
| SERVICING & TESTING OF POWER SUBSTATION INCLUDING RE-ALIGNMENT & FIXING OF 4 PCS. CROSS ARM OF THE ELECTRIC POST
|
MARIWASA SIAM CERAMICS INC.
| SERVICING, TESTING & CHANGE OF INSULATING OIL AT SUBSTATION # 3, 1500KVA FOR BLDG. # 3/4
|
LITTON MILLS INC.
| REPLACEMENT OF DEFECTIVE WOODEN POLE & TRANSMISSION LINE AT LMI COMPOUND
SERVICING & TESTING OF OCB & SUBSTATION SWITCHGEAR AT LMI COMPOUND
|
TEMIC PHILIPPINES, INC.
| THERMOSCANNING OF ELECTRICAL SYSTEM, TESTING OF 333KVA DISTRIBUTION TRANSFORMER
|
COLUMBIAN MOTORS
| ANNUAL TESTING AND SERVICING OF 11 UNIT MAIN SUBSTATION AND LOAD CENTER
LOAD BALANCING, MODIFICATION AND TRACING OF FAULTY WIRES AND CABLES
|
HONDA PHILIPPINES, INC.
| REWIRING OF MEZZANINE FLOOR PROJECT
SERVICING/TESTING OF POWER TRANSFORMER 1MVA
|
NOAH'S PAPER MILLS
| FILTERING OF GEAR OIL & REFILLING OF TRANSFORMER OIL INSTALLATION OF 2 UNIT 4160V TIE BREAKER
|
FIBERTEX CORP.
| SUPPLY & ERECTION OF CONCRETE POLE/FEEDER LINE INSTALLATION
|
ISUZU AUTO PARTS
| INSTALLATION OF STEEL TRUSS SUPPORT & T-50 SUBLINE PIPELINE
|
NISSIN - URC
| INSTALLATION OF VARIOUS ELECTRICAL WORKS FOR NOODLE LINE CODE "C"
|
GRANDSPAN DEVELOPMENT | STANDARD TESTING OF 2 SET DISTRIBUTION TRANSFORMER 3 X 333
REPAIR OF 167KVA PRIMARY TRANSFORMER BANK 220V SECONDARY 15.4KV
|
EDS MANUFACTURING INC.
| REPLACEMENT OF POWER CABLE CENTER 5KV
SERVICING OF POWER SUBSTATION
|
COATS MANILA BAY
| FABRICATION & INSTALLATION OF CABLE DUCT AND CABLE
PULLING OF 11 SETS CABLE TRAY
SERVICING OF 36 INDOOR CIRCUIT BREAKER
|
RFM CORPORATION
| REPAIR OF PIONEER PLANT BUILDING STRUCTURES AND SUBSTATION LIGHTING
|
TANDUAY DISTILLERS
| "EMERGENCY SUPPLY OF 60 HP BOOSTER PUMP LOCATED AT PUMP HOUSE 2
PROPOSED WASTEWATER TREATMENT PLANT & CPC PLANT"
|
GOKONGWEI BROTHERS FOUNDATION
| RELOCATION OF 70 FT. CREOSOTED WOODEN POLE AT LMI COMPOUND
|
SELECTA WALLS INC.
| RECTIFICATION OF LIGHTING SYSTEM AT FLOUR CAMP & MIXING AREA
|
AMERICAN WIRE & CABLE CO.
| EQUIPMENT & TECHNICAL SUPPLY & SERVICING OF SUBSTATION & POWER HOUSE
|
ABBOT LABORATORIES
| INSTALLATION OF 3 PHASE MOTOR & POWER PROTECTOR WITH OVER /UNDER VOLTAGE
|
ASIAN TRANSMISSION CORP.
| ANNUAL PREVENTIVE MAINTENANCE OF 26 UNITS ELECTRICAL PANELBOARD
REPLACEMENT OF TRANSFORMER OIL FOR POWER TRANSFORMER
|
URC - CFC
| REPLACEMENT OF 35KV HV POWER CABLE & TERMINATION
REFILLING OF 30 GALS. SILICON TRANSFORMER
|
IMI
| PREVENTIVE MAINTENANCE OF LBS & HIGH VOLTAGE SWITCHGEAR RENTAL OF 6 UNITS TRANSFORMER FOR 4 MONTHS
|
VISHAY PHILIPPINES
| TOTAL REPLACEMENT OF WIRE CABLE OF TRANSFORMER BANK # 2
|
URC - ROSARIO | INSTALLATION OF ONE SET LOAD BREAKER SWITCH
PREVENTIVE MAINTENANCE OF SUBSTATION
|
URC - GD ENGINEERING
| ELECTRICAL LIGHTING FOR PC LINE
|
GARDENIA BAKERIES INC.
| INSTALLATION OF 8 PCS HI-BAY LIGHTING FIXTURES AT PACKAGING AREA
|
LAMCOR
| PREVENTIVE MAINTENANCE ON PRIMARY POLE & SUBSTATION 1 & 2
|
URC - BOPP PLANT
| ELECTRICAL INSTALLATION OF ADDITIONAL BOPP LINE 2
|
JG SUMMIT PETROCHEMICAL CORP.
| CABLE PULLING & LAYING OF RADIATORS 3, 4 & 5 FAN MOTORS
|
ORMECO
| REPAIR & SERVICING OF 5MVA POWER TRANSFORMER @ NAUJAN S/S
|
INTERCON HOTEL MANILA
| GENERAL SERVICING OF INDOORS POWER SUBSTATION
|
URC - GD IV
| MODIFICATION & REHABILITATION OF ELECTRICAL SYSTEM OF CORNCHIPS
|
GREIF PHILIPPINES, INC.
| ELECTRICAL INSTALLATION FOR 1 MVA TRANSFORMER AS BUILT PLAN
|
SMITHKLINE BEECHAM
| SUPPLY & INSTALLATION OF POWDER COATED PANEL COVER
|
CLARION MFG. CORP.
| PREVENTIVE MAINTENANCE - OH LINES & POWER TRANSFORMER
|
GLAXO SMITHKLINE
| LAUNDRY ROOM RENOVATION
|
"FUJITSU COMPUTER
PRODUCTS CORP. OF THE PHILS."
| PROPOSED INSTALLATION OF ANNUNCIATOR PANEL OF PP1 & PP2
|
UNITED PULP & PAPER CO.
| FABRICATION & INSTALLATION OF CABLE TRAY & SUPPORT PREVENTIVE MAINTENANCE OF 4.16 KV SWGR. PM2, SP2, WP2
|
POWERLITE ELECTRICAL
| PREVENTIVE MAINTENANCE OF POWER TRANSFORMER AT SMC-PAMPANGA
|
LA TONDEÑA DISTILLERS, INC.
| INSTALLATION, TESTING & COMMISSIONING OF 1 UNIT GENSET 275KVA
|
ELECTROWATT EKONO
| TESTING OF POWER TRANSMISSION
|
WU KONG PTE LTD.
| REPAIR/REWINDING OF 1.4MVA 34.5KV / 230 VOLTS OUTDOOR TYPE POWER TRANSFORMER
|
BOBCOCK HITACHI
| ANNUAL PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT MAIN & SECONDARY SUBSTATION
|
VITARICH CORPORATION
| PREVENTIVE MAINTENANCE OF 2MVA TRANSFORMER
|
ARMED FORCES OF THE PHILS.
| SUPPLY & DELIVERY 2 UNIT 75KVA, 34.5KV/220V SINGLE PHASE, POLE MOUNTED TRANSFORMER
SERVICING OF 333KVA TRANSFORMER AT FORT BONIFACIO
|
CIP II
| TESTING OF 500KVA TRANSFORMER
|
GINEBRA SAN MIGUEL
| THERMAL SCANNING, CALIBRATION OF RELAY & DGA TEST
PREVENTIVE MAINTENANCE OF 2MVA SUBSTATION
|
SANTEH FEEDS CORP.
| OIL DIELECTRIC BREAKDOWN VOLTAGE TEST
|
DAIWA SEIKO PHILS.
| SERVICING OF LOAD BREAKERS SWITCH
|
VITALO PACKAGING CORP.
| SUPPLY AND DELIVERY OF DRY TYPE TRANSFORMER
|
SAMSUNG ELECTRONICS PHILS
| PREVENTIVE MAINTENANCE OF FIRST PRIVATE POLE
|
KINDEN PHILS. CORP.
| REFILLING OF R-TEMP, TRANSFORMER INSULATING OIL FOR 6 UNITS POWER TRANSFORMER
|
ELECTROBUS CONSOLIDATED
| TESTING OF OIL BREAKDOWN VOLTAGE TEST
|
ORMECO
| REPAIR OF 1.6MVA, POWER TRANSFORMER 4.16/13.8, 3P 60HZ
|
SAN PABLO MFG. CORP.
| PREVENTIVE MAINTENANCE OF POWER SUBSTATION (2-200KVA POWER TRANSFORMER)
|
EDWARD KELLER PHILS. INC.
| PREVENTIVE MAINTENANCE OF TRANSFORMER B
|
URC - TARLAC
| AS BUILT PLAN - TARLAC PLANT
|
URC - PAMPANGA
| ELECTRICAL HIGH TENSION WORKS (SUPPLY INSTALLATION OF LBS FOR 1.5MVA)
|
AMERTRON INC. -PAMPANGA
| ELECTRICAL & MECHANICAL WORKS FOR NEW POI BLDG.
|
ASIAN CARMAKERS
| PREVENTIVE MAINTENANCE OF POWER SUBSTATION FACILITIES
|
R. J. LANDOY & ASSOCIATES
| INSTALLATION OF FIRST PRIVATE POLE AT LITTLE SISTERS OF THE POOR AT PASAY CITY
|
URC - BOPP
| ELECTRICAL WORKS FOR FLEXIBLE PACKAGING PLANT PROJECT AT SIMLONG BATANGAS
|
TAKATA CORP.
| PREVENTIVE MAINTENANCE OF SUBSTATION TRANSFORMER & OTHER RELATED EQUIPMENTS
|
ASIA PACIFIC PLASTICS CORP.
| PREVENTIVE MAINTENANCE OF SUBSTATION TRANSFORMERS & SWITCHGEARS
|
SUNPOWER PHILS. MFG. LTD.
| REPLACEMENT OF 3 UNITS POWER FUSE
|
TERUMO PHILS. CORP.
| PREVENTIVE MAINTENANCE OF SUBSTATION TRANSFORMERS SWITCHGEARS & DISCONNECT SWITCHES
|
LAMCOR
| SUPPLY & INSTALLATION OF ENCLOSED CIRCUIT BREAKER
|
ASTEC POWER CORP.
| PREVENTIVE MAINTENANCE OF SUBSTATION TRASNFORMERS
|
AMERTRON INC. -PAMPANGA
| REPLACEMENT OF TRANSFORMER SECONDARY CABLES & BUSBARS
|
URC ROSARIO
| INSTALLATION OF COFFEE 2.0MVA TRANSFORMER & ACCESSORIES
|
ORMECO
| REHABILITATION OF DAMAGE TRANSMISSION LINES AT CALAPAN & NAUJAN
|
SOLID LAGUNA PLASTICS CORP
| REPLACEMENT OF MAIN SECONDARY FEEDER LINES
|
P. IMES CORP.
| PREVENTIVE MAINTENANCE OF SUBSTATION TRANSFORMERS & ELECTRICAL PANELBOARDS
|
URC ROSARIO
| PHASE 1 ELECTRICAL INSTALLATION OF HUNTS PROJECT
|
LAMCOR
| SUPPLY & INSTALLATION OF ADDITIONAL PANELBOARD
|
SMITHKLINE BEECHAM
| UPGRADING OF HVAC POWER SUPPLY
|
CONTINENTAL TEMIC
| SUPPLY OF ELECTRICAL DISTRIBUTION PANEL
|
AVON
| SLM UPGRADING OF ELECTRICAL AT PHA PACKAGING
|
PUREFOODS HORMEL
| INSTALLATION OF POWRE SUPPLY LINE & PERIMETER LIGHTNING FOR SOFT WATER TANK
|
TERUMO PHILS. CORP.
| REPLACEMENT OF TRANSFORMER INSULATING OIL
|
TEMIC
| CONSTRUCTION OF FLAMMABLE/CHEMICAL STORAGE
|
TEMIC AUTOMOTIVE
| RECONDITIONING OF MAIN POWER TRANSFORMER
|
MARIWASA SIAM CERAMICS INC.
| UPDATING OF SINGLE LINE DIAGRAM FOR 34.5KV FIRST PRIVATE POLE TO HV SUBSTATION
|
TEMIC AUTOMOTIVE
| REPLACEMENT OF TRANSFORMER OIL SHELL DIALA
|
MARIWASA SIAM CERAMICS INC
| RETROFITTING OF AIR CIRCUIT BREAKER
|
SMITHKLINE BEECHAM
| ADDITIONAL WORKS FOR OVEN ROOM
|
YOKOHAMA
| LABORATORY OF TRANSFORMER OIL
|
TAKATA CORP.
| REPLACEMENT OF DEFECTIVE BUSHING
|
EUROTEC INDUSTRIAL
| SUPPLY & DELIVERY OF 3 UNITS 75KVA TRANSFORMER
|
SOLID LAGUNA CORP.
| INSTALLATION OF PVC CONDUIT FROM GENSET TO MANHOLE AND WIRING INSTALLATION
|
ATC
| FILTERATION OF DEGASIFIER OF TRANSFORMER INSULATING OIL
|
CONTINENTAL TEMIC
| SUPPLY & INSTALLATION OF DILAPIDATED FLEXIBLE COPPER BUSBAR
|
LAMCOR
| INSTALLATION OF ADDITIONAL PANELBOARD
|
TEAM PACIFIC
| REPLACEMENT OF UNDERGROUND CABLE WIRE OF BLDG. 2 POWER SUPPLY
|
PUREFOODS HORMEL
| REPLACEMENT OF WOODEN CROSS ARM OF POLE # 1, SUBSTATION # 1 & SUBTATION # 1A
|
PEAMSKONSTRUKT BUILDERS
| 34.5KV TRANSMISSION LINE PROJECT (TERNATE)
|
VISTA DE LORO
| PREVENTIVE MAINTENANCE OF POWER TRANSFORMER
|
COASTAL BAY CHEMICALS
| PREVENTIVE MAINTENANCE OF 1500KVA & OTHER SUBSTATION
|
SMITHKLINE BEECHAM
| INSTALLATION OF EXPLOSION PROOF LIGHTING & ELECTRICAL
|
COATS MANILA BAY
| REPLACEMENT OF 333KVA POLE MOUNTED TRANSFORMER
|
PREMIUM PLASTIC
| TESTING & FILTERING OF 4 UNITS TRANSFORMER
|
UNITEC RESOURCES, INC.
| EXTENSION OF 13.8KV OVERHEAD TRANSMISSION LINE & INSTALLATION
|
TAKATA CORP.
| SERVICING OF POWER TRANSFORMER
|
GLADES INT'L. CORP.
| ADDITIONAL CABLE LAY OUT FOR GROUNDING SYSTEM
|
EUROTEC
| FABRICATION OF TRANSFORMER 250 KVA
|
OFFICE TIGER PHILS. CORP.
| ELECTRICAL WORKS/LINE INSTALLATION 5F, BASEMENT 6F, 7F, 8F, 9F
|
EDWARD KELLER PHILS. INC.
| REPAIR OF TRANSFORMER 1.5MVA
|
MAXIM PHILS. INC.
| DEGASIFICATION OF 4 UNITS TRANSFORMER
|
UPPC
| INSTALLATION OF POWER SYSTEM FOR PM2, WIRE DRIVE REBUILD
|
PEAMSKONSTRUKT BUILDERS
| REPLACEMENT OF CONCRETE POLE FOR VARIOUS NBC FACILITIES - SAN FELIPE / SANGLEY POINT
|
MARIWASA SIAM CERAMICS INC
| CALIBRATION OF CONTROL SYSTEM & DEVICE
|
TEMIC AUTOMOTIVE PHILS.
| THERMOGRAPHIC SCANNING OF ELECTRICAL FACILITIES
|
ASIAN TRANSMISSION CORP.
| FILTERATION & DEGASIFICATION OF TRANSFORMER OIL
|
PEAMSKONSTRUKT BUILDERS
| ERECTION OF CONCRETE POLE & RELOCATION OF 3-167KVA TRANSFORMER
|
HTI(S) PTE., LTD.
| MODIFICATION OF ENTRANCE POLE @ HTI SITE SIDING PLANT
CONSTRUCTION OF STEEL STRUCTURE FOR 1.4MVA POWER S/S
|
ASIAN CARMAKERS CORP.
| SERVICING OF POWER TRANSFORMER
|
PUREFOODS HORMEL
| THERMOGRAPHIC SCANNING OF ELECTRICAL FACILITIES
|
RFM CORPORATION
| ELECTRICAL WORKS IN CANNING LINE
|
MIESCOR BUILDERS
| EMERGENCY WORK - NIDEC COPAL
|
SOLID LAGUNA
| SERVICING & TESTING OF POWER SUBSTATION FACILITIES
|
"D'RB ELECTRICAL &
MECHANICAL SERVICE ENCOUNTER"
| SUPPLY & ERECTION OF 7 CONCRETE POLES - 34.5KV TRANSMISSION LINES
|
TNC CHEMICAL PHILS. INC.
| ERECTION OF CONCRETE POLES & SUPPLY OF POLE LINE HARDWARE
|
MUNICIPALITY OF NAUJAN
| DEGASIFICATION OF TRANSFORMER OIL
|
ORMECO
| DEGASIFICATION OF 40 DRUMS TRANSFORMER OIL
|
UPPC
| INSTALLATION, COMMISSIONING & TERMINATION OF CABLES
|
TERUMO PHILS. CORP.
| ANNUAL PREVENTIVE MAINTENANCE OF POWER SUBSTATION
|
UNITEC RESOURCES, INC.
| INSTALLATION OF TRANSFORMER AT PEPSI COLA PLANT IN ILOILO
|
TAKATA CORP.
| SUPPLY OF LABOR & INSULATING TRANSFORMER OIL (9 DRUMS)
|
UNIVERSAL AQUARIUS INC.
| PROVISION/INSTALLATION OF FEEDER LINE
|
UNITEC RESOURCES, INC.
| OVERHEAD TRANSMISSION LINES & INSTALLATION OF 2 UNITS PAD MOUNTED TRANSFORMER
|
ORMECO
| LINE CONSTRUCTION PROJECT
|
R & M CONSTRUCTION, INC.
| PREVENTIVE MAINTENANCE IN SAN MIGUEL CORP. (PANDACAN)
|
BATANGAS BAY INC.
| DEGASIFICATION OF 1000KVA TRANSFORMER OIL
|
RUBLOU INC.
| CONSTRUCTION OF SLAUGHTER HOUSE
|
UNISON JV - DATA CENTER
| ELECTRICAL WORKS - EXPANSION AT COMELEC ITD 7TH FLOOR @ PALACIO DEL GOBERNADOR
|
SENSIENT TECH. (PHILS.) INC.
| ELECTRICAL SUPPLY & PANEL METER
|
MAXIM PHILS. INC. | PREVENTIVE MAINTENANCE & CORRECTION OF 1ST PRIVATE POLE HOTSPOT
|
UP LOS BAÑOS
| FILTERING OF EXISTING SILANGAN POWER SUBSTATION
|
MARIWASA SIAM CERAMICS
| ELECTRICAL SYSTEM-SERVICING PLANTWIDE & SUBSTATION OF ACSR
|
HOOVEN PHILS. INC.
| FEEDERLINE RATIONALIZATION "CLEAN UP LVSG FOR 1500KVA TRANSFORMER
|
DENR - ECOSYSTEMS RESEARCH DEV'T. BUREAU
| REHABILITATION OF ERDB POWER LINE SYSTEM
|
OPERATION & MAINTENANCE TECHNOLOGY PHILS. INC.
| OIL LAB TEST & PREVENTIVE MAINTENANCE OF POWER TRANSFORMER AT SOHBI KOHGEI (PHILS.) INC.
|
"LAGUNA AUTO-PARTS MFG.
CORP."
| SUPPLY/INSTALLATION OF ENCLOSED CIRCUIT BREAKER
|
COLUMBIAN AUTO-CAR CORP.
| INSTALALTION OF MERALCO LOAD @ LIIP PLANT
SUPPLY/DELIVERY OF 3 UNITS 250 KVA TRANSFORMERS
|
STEEL CORP. OF THE PHILS. | ANNUAL PREVENTIVE MAINTENANCE OF SCP PLANT SUBSTATION
POWER QUALITY ANALYZER MONITORING
|
UNITEC RESOURCES INC.
| SUPPLY/INSTALLATION OF MEDIUM VOLTAGE DISTRIBUTION SYSTEM (34.5KV)
|
BATAAN 2020, INC. | RELOCATION OF 69KV TRANSMISSION LINE
DISMANTLING & REINSTALLATION OF POWER CABLE
|
MARIWASA SIAM CERAMICS INC.
| SUPPLY/INSTALLATION OF CABLE INSULATOR, RELOCATION OF 4160V OVERHEAD LINE, TRANSFORMER AND ACCESSORIES FROM GASIFIER TO BPD
,REPLACEMENT OF TRANSMISSION LINE
,REACTIVATION OF 6MVA TRANSFORMER
,INSTALLATION OF 1 SET XLPE POWER CABLE & 2 SETS TERMINATION KIT FOR NEW 1.5MVA TRANSFORMER
|
LAMCOR | INSTALLATION OF SEPARATE DISCONNECTING SWITCH OF TRANSFORMER BLDG. 3, PREVENTIVE MAINTENANCE OF LBS, TRANSFORMER & LVSG
|
AXIM PHILS. OPERATING COR
| ANNUAL PREVENTIVE MAINTENANCE FIRST PRIVATE POLE
|
EDWARD KELLER (PHILS.), INC.
| ANNUAL PREVENTIVE MAINTENANCE OF EKPI SUBSTATION
|
UNITED PULP & PAPER CO., INC
| SERVICING OF TRANSFORMER AT PM1
|
HARMONIC SYSTEM, INC.
| TESTING OF TRANSFORMER @ ABS CBN BROADCASTING TESTING OF POWER TRANSFORMER @ UNION BANK
|
PHIL. RECYCLERS, INC.
| PREVENTIVE MAINTENANCE OF DRY TYPE TRANSFORMERS AND FIRST PRIVATE POLE
|
CONTINENTAL TEMIC ELECTRONICS PHILS., INC.
| ANNUAL PREVENTIVE MAINTENANCE OF 2 SETS FIRST PRIVATE POLE, ACCESSORIES, XLPE's
REVISION OF EXISTING EQUIPMENT GROUNDING SYSTEM
|
STEEL CORP. OF THE PHILS.
| CGL LINE & FINISHING LINE VOLTAGE DIPS & TRANSIENTS CHECK/MEASUREMENT INCLUDING POWER QUALITY ANALYZER
|
EMERSON - ASTEC POWER
| SUPPLY OF 24 UNITS 7.5KVA TRANSFORMER, PREVENTIVE MAINTENANCE OF SUBSTATION TRANSFORMERS, PREVENTIVE MAINTENANCE OF ALL VACUUM CIRCUIT BREAKER
|
ASIAN TRANSMISSION CORP.
| SERVICING OF POWER TRANSFORMER
|
SMYPC - MANILA PLASTIC PLANT
| PREVENTIVE MAINTENANCE OF 1500KVA TRANSFORMER
|
PTL POWER CORP.
| REFILLING & FILTERING OF 18MVA TRANSFORMER
|
COASTAL BAY CHEMICALS
| PREVENTIVE MAINTENANCE OF 1500KVA TRANSFORMER AND OTHER SUBSTATION FACILITIES
|
UNITED PULP & PAPER CO., INC
| DEGASIFICATION OF 2 UNITS 2MVA TRANSFORMER, REWINDING OF MOTOR 1-110KW & 1-0.75KW, SERVICING & PM OF 8 UNITS TRANSFORMERS, SERVICING OF MCC PANEL AT SP2 & PM2
|
FLEXO MFG. CORP.
| PROVISION OF EMERGENCY FEEDER FOR 1.5MVA PAD MOUNTED TRANSFORMER, PROPOSE OF 13.8KV OVERHEAD TRANSMISSION LINE
|
SAMSUNG ELECTRO- MECHANICS PHILS. CORP.
| DISSOLVED GAS & OIL CHEMICAL TEST
|
ITSUBISHI MOTOR PHILS. COR
| ANNUAL PREVENTIVE MAINTENANCE OF HVSG POWER TRANSFORMER A, B, C & PLANT 1 AND PLANT 2
|
UNITEC RESOURCES INC.
| SUPPLY & INSTALLATION OF PRIMARY POWER SYSTEM
|
SAN MIGUEL YAMAMURA PCKG.
| MPP-FACILITIES MAINTENANCE SERVICES FOR ELECTRICAL, MECHANICAL & BLDGS.
|
MARIWASA SIAM CERAMICS INC
| RELOCATION OF HIGH TENSION WIRE NEAR GAS TANK
|
MAXIM PHILS.
| PM OF ELECTRICAL EQUIPMENT, PM OF 3 FIRST PRIVATE POLE
|
ASTEC POWER PHILS.
| OIL DEGASIFICATION OF 1.5MVA & 5.0MVA TRANSFORMER
|
GRANDSPAN DEV'T. CORP.
| INSTALLATION OF HDG CROSS ARMS FOR GDC PLANT
|
EMIC AUTOMOTIVE (PHILS.) IN
| SERVICING OF 1ST PRIVATE POLE, LVSG & TRANSFORMER W/ DGA
|
ASIAN TRANSMISSION CORP.
| PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT
|
BATAAN 2020, INC.
| FABRICATION AND INSTALLATION OF CABLE TRAY AND CABLE PULLING
|
ASTEC POWER PHILS.
| ANNUAL PREVENTIVE MAINTENACE OF FIRST PRIVATE POLE, LOW AND MEDIUM VACCUM CIRCUIT BREAKERS (LAGUNA PLANT)
|
MARIWASA SIAM CERAMICS INC.
| PREVENTIVE MAINTENANCE OF OVERHEAD 34.5KV TRANSMISSION LINE, HVSG, FIRST PRIVATE POLE, MVSG AND RERAIR/REPLACE OF DEFECTIVE CUT OUT ASSEMBLE, REPAIR OF MVSG TRANSFORMER, REPAIR OF CERAMIC INSULATOR OF LIGHTING ARRESTER AT MVSG
|
GINEBRA SAN MIGUEL
| PREVENTIVE MAINTENACE OF 2MVA TRANSFORMER AND SECONDARY MAIN CIRCUIT BREAKER, HIGH TENSION SUPPLY. GROUNDING TESTS, OIL LABORATORY TESTING FOR TRANSFORMERS, AND THERMOGRAPHIC SCANNING OF ELECTRICAL FACILITIES (CABUYAO PLANT)
|
UNITEC RESOURCES, INC.
| SUPPLY AND INSTALLATION OF CONCRETE POLES AND ACCESSORIES, INSTALLATION AND TERMINATION OF 34.5KV XLPE CABLES FOR 3-333KVA TRANSFORMER BANK, SUPPLY AND INSTALLATION OF FUSE CUT-OUTS AND LIGHTNING ARRESTERS
|
ASTEC POWER PHILS.
| PREVENTIVE MAINTENACE OF 3.5MVA, 2MVA, 1.5MVA, 1.6MVA AND 2-AMVA TRANSFORMERS, CALIBRATION OF 8-POWER PROTECTION RELAYS OF LAGUNA PLANT
|
RFM CORPORATION
| ANNUAL PREVENTIVE MAINTENACE OF ELECTRICAL FACILITIES
|
COASTAL BAY CHEMICALS
| PREVENTIVE MAINTENANCE OF 1.5MVA TRANSFORMER AND OTHER SUBSTATION FACILITIES
|
CONTINENTAL TEMIC
| INSTALLATION OF TRANSFORMER GATE VALVE AND SUPPLY OF TRANSFORMER OIL
|
ASIAN TRANSMISSION CORP.
| PREVENTIVE MAINTENANCE OF TRANSFORMER W/ OIL PURIFICATION
|
CIRCUIT 2 ENTERPRISES
| TESTING AND RE-CONDITIONING OF O.C.B. AT LEYTE WATER PUMP STATION
|
SAN MIGUEL YAMAMURA PCKG
| METAL WORKS AND WATER BATTERY REPAIR SERVICES
|
LAGUNA AUTO-PARTS
| PREVENTIVE MAINTENANCE OF TRANSFORMERS, LVSG, LBS AND PRIVATE POLES
|
FLEXO MFG. CORP.
| SUPPLY AND INSTALLATION OF ISOLATION TRANSFORMER
|
BATANGAS BAY TERMINALS INC.
| ANNUAL PREVENTIVE MAINTENACE OF SUBSTATION AND REPLACEMENT OF INSULATING OIL OF POWER TRANSFORMER
|
SENSIENT TECH. (PHILS.) INC.
| MODIFICATION OF POWER SYSTEM AT KPL PLATFORM
|
UNITED PULP & PAPER CO., INC.
| ANNUAL PREVENTIVE MAINTENACE AND OIL REPLACEMENT AND DEGASIFICATION OF 1.6MVA TRANSFORMER (86EE22), PREVENTIVE MAINTENANCE AND OIL PURIFICATION OF 1.6MVA (86EE21), 1.6MVA (86EE23), 1.6MVA (86EE19) POWER TRANSFORMERS
|
CIRCUIT 2 ENTERPRISES
| REPAIR OF 1.5MVA POWER TRANSFORMER AT ISABEL LEYTE
|
COASTAL BAY CHEMICALS
| REPLACEMENT OF DEFECTIVE TEMPERATURE & PRESSURE GAUGES
|
EAST PACIFIC STAR BOTTLERS PHILS., INC.
| THERMAL SCANNING OF 3-333KVA TRANSFORMER, FUSE, CUT OUTS, AND LOW VOLTAGE SWITCH GEARS
|
MARIWASA SIAM CERAMICS INC
| THERMAL SCANNING OF FIRST PRIVATE POLE AND REPAIR OF HOT SPOTS, TESTING OF 7.5 MVA TRANSFORMER, POWER FUSES, AND CABLES, AND REPLACEMENT OF BUSTED FUSES
|
D.M. CONSUNJI, INC.
| NORTH A 6TH PUMP AND VALVE REPLACEMENT FOR NORTH ABC LA MESA DAM
|
GREENLIGHT POWER, INC.
| TESTING OF 1.5MVA TRANSFORMER, LBS AND XLPE CABLE
|
EDS MANUFACTURING INC.
| REPAIR OF MAIN TRANSFORMER (OIL LEAK)
|
POWER DIMENSION INC.
| PREVENTIVE MAINTENANCE OF BUSWAY BUSDUCT & BUS PLUG, DRY TYPE TRANSFORMERS & THE SUBSTATION FACILITY OF LAND BANK PLAZA, MANILA, "CONSTRUCTION OF BANENGBENG SUBSTATION, ERECTION OF STEEL STRUCTURE
& TESTING/COMMISSIONING OF 3-5000KVA TRANSFORMER"
|
"LAGUNA AUTO-PARTS MFG.
CORP."
| SUPPLY/INSTALLATION OF ELECTRICAL & MECHANICAL MATERIALS FOR TRANSFER OF FABRICATION LINE TO OLD EMD/PRODUCTION OFFICER
|
UNITEC RESOURCES INC.
| 34.5KV FIRST PRIVATE POLE/3-500KVA TRANSFORMER BANK AT BATANGAS, 45 SAN MIGUEL PROJECT, 34.5KV TERMINATION WORKS & TESTING OF TRANSFORMERS
34.5KV FIRST PRIVATE POLE/3-500KVA TRANSFORMER BANK AT BATANGAS
|
SAY ENTERPRISES, INC.
| TRANSFORMER OIL REFILL & TESTING FOR EGI RUFINO PLAZA
|
SQUARE D TECH & DEV'T. CORP
| PROVISION OF 34.5KV PRIMARY DISTRIBUTION LINE @ BIÑAN LAGUNA
|
PV ELECTRO TECH PHILS. COR
| INSTALLATION OF TRANSFORMER AT OCEAN AIRE PROJECT
|
ASTEC POWER PHILS.
| SERVICING OF FGA OF SUBSTATION TRANSFORMER 1.5MVA & 5MVA @ CAVITE PLANT
|
PRIMATECHNIX ELECTRICAL SERVICES
| PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT AND PRIVATE POLES @ ANALOG DEVICES, SERVICING/TESTING OF 1-UNIT 2.5MVA POWER TRANSFORMER @ COATS MANILA BAY
|
STEEL CORP. OF THE PHILS.
| PREVENTIVE MAINTENANCE/SERVICING OF 69/13.8KV SUBSTATION & SWITCHBOARD @ SCP - BALAYAN
|
MAIBARARA GEOTHERMAL, IN
| DGA & OIL QUALITY TESTING OF 3 UNITS TRANSFORMER OF MAIBARARA POWER PLANT
|
VA TECH WABAG (PHILS.) INC.
| DEGASIFICATION OF 1-UNIT 2250KVA TRANSFORMER @ PUTATAN
|
WESTCO ELECTRICAL & EQPT CORP
| PREVENTIVE MAINTENANCE OF 34.5KV INCOMING POWER LINE 10 UNIT POST
|
UNITEC RESOURCES INC.
| PRIMARY LINES ELECTRICAL WORKS @ PEPSI MUNTINLUPA
|
ASIAN TRANSMISSION CORP.
| PREVENTIVE MAINTENANCE OF 8 UNITS - 500KVA, 3 UNITS - 200KVA 1 UNIT - 300KVA DISTRIBUTION TRANSFORMER, PURIFICATION OF INSULATING OIL & REPAIR OF OIL LEAKS
|
GINEBRA SAN MIGUEL, INC.
| SERVICING & OIL LAB TESTING FOR OIL FILLED TRANSFORMER (2MVA), REPAIR & MAINTENANCE OF ELECTRICAL SYSTEM OF GSMI LAGUNA
|
CONTINENTAL TEMIC ELECTRONICS PHILS., INC.
| FILTERING OF INSULATING OIL & FUNCTIONAL TEST OF 2.0MVA PAD MOUNTED TRANSFORMER # 1 @ BLDG. 2
|
GRANDSPAN DEV'T. CORP.
| TESTING/PREVENTIVE MAINTENANCE OF DISTRIBUTION TRANSFORMER 9-UNIT 333KVA, 6-UNITS 250KVA & 3-UNITS LOAD BREAK SWITCH
|
HIGH STREET (SPV-AMC), INC. | REPLACEMENT OF TRANSFORMER OIL (1.2MVA,2-1MVA) & STANDARD TESTING OF 40MVA TRANSFORMER @ CALACA PLANT, BATANGAS |
BATAAN 2020, INC.
| PAPER MILL 6 BLDG. LIGHTING & POWER LAYOUT INSTALLATION
|
REY-TECH CONSTRUCTION
| VARIOUS ELECTRICAL WORKS FOR AGRI PACIFIC ELECTRICAL PROJECT
|
GMA NETWORK, INC.
| SUPPLY AND INSTALLATION OF POLE MOUNTED STREET LIGHT INSIDE THE GMA TANDANG SORA COMPOUND
|
NATIONAL MAPPING & RESOURCES INFORMATION AUTHORITY
| CHECK-UP AND MAINTENANCE OF GENERATOR (288 KVA)
|
CAN ASIA, INC.
| INDUSTRIAL MOTORS GENERAL AUDIT / ELECTRICAL MAINTENANCE
|
UNITED PULP & PAPER CO., IN
| INSTALLATION OF 500MM² XLPE CABLE
|
OMNI SOLID SERVICES
| AS BUILT PLAN - ELECTRICAL SYSTEM
|
NATIONAL MAPPING & RESOURCES INFORMATION AUTHORITY
| OTHER NECESSARY TO COMPLETE PRIMARY LINE FOR MAGNETICS OBSERVATORY
|
OMTPI
| OIL LEAK REPAIR OF 1000KVA TRANSFORMER AT SOHBI
|
NAMRIA
| PM OF 6 UNITS POLE MOUNTED TRANSFORMERS, POLE LINE ACCESSORIES, LVSG
|
SPLASH CORP.
| "PM OF THE POWER SUBSTATION, 1ST PRIVATE POLE, POWER HOUSE & MCC
ROOM, REPLACEMENT OF CORRODED AND REPAINTING OF RUSTED MECHANICAL PARTS OF 1ST PRIVATE POLE
|
IBH ELECTRICAL SERVICES
| THERMAL SCANNING COVE LIGHTING LEVEL 1 & 2 CASINO BLDG., POWER HARMONICS ANALYSIS (14 UNITS)
|
ASIAN TRANSMISSION CORP.
| ANNUAL PREVENTIVE MAINTENANCE OF DISTRIBUTION TRANSFORMER
|
LAMCOR
| PREVENTIVE MAINTENANCE OF TRANSFORMER INCL. CLEANING OF ASH FALL
|
COLUMBIAN AUTO-CAR CORP.
| PREVENTIVE MAINTENANCE OF TRANSFORMERS, SUPPLY & TOPPING OF MINERAL OIL ON TRANSFORMER (LIIP)
|
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |